Wastewater

Wastewater 2014

0h 1min Director: Stephen Broomer

The North Toronto Wastewater Treatment Plant lies in thick brush downhill from a hydroelectric corridor. The eye bounces, guided by the vertical forms coming up out of the valley, and a low flame bridges these movements.

Log in to rate, mark as watched, and write a review.

Crew

Director
Stephen Broomer

Details

Release date
Apr 20, 2014
Runtime
1 min
Status
Released
Language
EN

Reviews

No ratings yet - be the first. Watched: 0 0

You might also like